The SWMS the builder asked for, written for your job in about a minute.
Describe the task. SafeMethod writes a site-specific safe work method statement you can edit, issue as a PDF, and have your crew sign on their phones. Free to preview, $29 to download.
- Covers all 18 high-risk construction work categories
- Edit every line before you issue
- Workers sign on their phone
- Mac and iPhone apps included
What you get
Safe Work Method Statement
Roofing: replace guttering and downpipes, two-storey dwelling
Roofing: replace guttering and downpipes, two-storey dwelling
Version 1
Issued 19 Oct 2026
Issued 19 Oct 2026
| Step | Hazards | Controls | Risk |
|---|---|---|---|
| 3. Erect mobile scaffold on driveway | Scaffold collapse, falls during erection, struck by vehicles | Scaffold erected by competent person to AS/NZS 1576, outriggers fitted, driveway closed with bollards and signage | High → Low |
| 5. Remove old gutter sections from boom lift | Fall from EWP basket, dropped objects, contact with overhead power | Harness to AS/NZS 1891.1 clipped to anchor, exclusion zone below, 3 m clearance from service lines confirmed | Extreme → Low |
Plus PPE, permits, legislation, emergency arrangements, monitoring and a sign-on register. 9 steps in total for this job.
How it works
- Describe the job. Trade, task, site and the high-risk categories that apply. Thirty seconds.
- Check the draft. Hazards, controls, risk ratings, PPE, permits and legislation, written for this site. Change anything.
- Issue and sign. Download the PDF or send a link. Your crew read the summary and sign on their phone. Every signature is on the record.
Pricing that matches the job
One document for $29. Unlimited documents, the Mac and iPhone apps and worker sign-on for $39 a month. No contract. See all plans.
Questions tradies ask
- Is this legally compliant?
- The document follows the structure in the Safe Work Australia Code of Practice: Construction Work and the WHS Regulations (regulations 299 to 303), and names the legislation for your region. You remain responsible for checking it matches the site and the way you actually work. That is why every line is editable.
- Does it work in the UK or the US?
- Yes. Choose the region and you get a RAMS (UK) or a JHA (US) with the right legislation and spelling.
- How do my workers sign?
- Issue the document and you get a link and QR code. Workers open it on their phone, read the summary and controls, tick that they understand it, and sign with a finger. You see every signature with the date and version.
- What if the builder wants changes?
- Edit and issue a new version. The sign-on link stays the same; new signatures are recorded against the new version.